Sunday, August 28, 2011

Subfloor Done (For Now)

On Saturday, August 27th, we reached a milestone.  We are now happy to say that most of the subfloor has been installed!  It may not seem very exciting but this brings the renovation progress one step closer toward completion.  Plus, I get a break from helping haul those 80-pound sheets from the shelf at Home Depot to the trailer and from the trailer to the house.

The final (for now) portion of sub-floor to be installed on the first floor was in the west end of the library. 

The view from the current breakfast nook.

The final problem on the second floor was the hallway outside the bathroom.  The original plank sub-floor was nearly worn through so Scott and Carl replaced it with a sheet of 23/32nd" Norbord TruFlor.

The view from below as the final sheet goes down.